EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
E-Xenos
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (122)
Research
Workshop
- (4)
-
Preparations at BACE...
-
Preparation - shelf...
-
Setting up workspace...
Empennage
- (1)
-
Y tail riveting
Fuselage
- (78)
-
Checking the fit
-
Checking the fit
-
Rivets in cockpit...
-
Drilling into STICK...
-
adjust rudder...
-
Charger installation
-
Sit test
-
Seat sling installation
-
various
-
Puyallup fair
-
drilling through...
-
First Rollout
-
Installed axles and...
-
Motor mount and...
-
Motor mount trial fit
-
re-drill for wheel...
-
Fabricated and...
-
Grinding motor mount...
-
Skin polishing and N...
-
Attach fwd fuselage
-
seat assembly
-
cockpit work and...
-
Cockpit floor...
-
Fuselage work
-
Cockpit to Fuselage
-
visit by Nantu...
-
Deburring and more
-
Checking the fwd...
-
Firewall and...
-
Kitsap Sun front page
-
Y-tail and more...
-
Firewall
-
Forward fuselage...
-
Turtle back Rib...
-
Firewall fabrication
-
General fuselage
-
Riveting the...
-
Wing leading edge...
-
Turtle deck,...
-
Ribs for turtle deck...
-
Cockpit side panels
-
Yasmine pulls rivets
-
Fuselage box assembly
-
Phenolic work starts
-
Fuselage box assembly
-
More Corrosion...
-
Corrosion protection
-
Y-tail frame to...
-
Turtleneck work...
-
Squaring of...
-
More squaring of...
-
Squaring fuselage
-
Fuselage box - start...
-
Begin assembling...
-
nut plates for two...
-
U-channel work and...
-
Fuselage cross-ties
-
Fuselage cross-ties...
-
Tips of V tails
-
Nut plates in...
-
V-tail
-
Y-tail skeleton
-
Data probe
-
Ribs continued
-
V-Tail ribs continued
-
V-tail ribs correction
-
tail hinge
-
bending tail ribs
-
Fixing bad V-tail...
-
shop cleanup and...
-
Shop cleanup and...
Firewall
Tail Feathers
- (7)
-
Y tail assembly
-
Y tail install
-
Y tail install
-
MJ and Mark fitting...
-
Fitting the tail
-
Stabilator assembly
-
Stabilator fabricaton
Wings
- (27)
-
Bottom wing skin...
-
Bottom wing skin...
-
Leading Edge Assembly
-
Right wing fully...
-
Skins on right wing...
-
Spar riveting...
-
Slight spar swerve...
-
6 layer spar
-
spar rivets continue
-
spar chemical...
-
Dimpling and...
-
belly skin and...
-
FLY ELECTRIC LLC...
-
Wing spar and wing...
-
wing spar riveting
-
Lysa Wyni visits...
-
All 4 Jesus nuts are...
-
Crowded shop
-
Wing work starting -...
-
Ribs Ribs Ribs
-
Aft Spar layout
-
seatbelts and more
-
Leonard B drilling...
-
Wing spar to...
-
Wing spar to fuselage
-
rudder pedals -...
-
Install bracket to...
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (2)
-
Assembly of...
-
Powerplant removal...
Propeller
Fuel System
Interior Finish
- (1)
-
Oregon Aero Interior
Paint / Decals
Inspection
Tools
Kit Arrival
- (2)
-
MJ arrives with...
-
MJ Arrives with the...
Builder Name:
zachary krause
-
Project:
Xenos
-
VIEW REPORTS
Total Hours:
805.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 12, 2021 - Sep 10, 2023
Engine:
Flit electric
Propeller:
Sensenich fixed pitch wood propeller
Panel:
Uavionics
Friendly URL:
https://eaabuilderslog.org?s=E-Xenos
Home or Last Project Picture
Sep 27, 2023
Lysa Wyni visits from Solomon Islands and builds an electric airplane part
Category: Wings
IMG_20230927_171736763_HDR.jpg
IMG_20230927_172458721_HDR.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.